Fusion extra long lead

Article no: TR-207512

CHF 15.90

Stock: 0

Ready for dispatch in 1-3 days, delivery time 7 working days

Delivery between Friday, 4 December and Monday, 7 December
Colors (2)
Sizes (9)
product-image
Order accessories for this item at the same time
from CHF 14.90
from CHF 19.90
Zahlungsarten
Product information "Fusion extra long lead"

Fusion extra long lead rubberised

The Fusion extra long lead has a rubberised webbing which makes the lead extremely non-slip. The lead has a hand loop and is available in two strengths/widths.

  • Rubberised webbing
  • with neoprene-padded hand loop
  • with eyelet, e.g. for attaching the dog tag or a flasher
  • non-slip and grippy

Available in two widths:

  • 1.80 m / 17 mm
  • 1.80 m / 25 mm

Colours: Graphite / Papaya or Graphite / Ocean

Color: graphite/papaya
Size in cm: 1.80m / 17mm
Composition
Feeding recommendation
Technical details
Size information

0 out of 0 reviews

Give us a rating!

Share your experience with the product with other customers.


Accessories

Accessories

Fusion Tracking Leash, rubberized
Fusion tracking Leash in two colours This towline is non-slip and feels very comfortable in the hand. In both colours the 3 m long lead is without hand loop, all other lengths are equipped with hand loop.This lead is suitable for dog training, e.g. for training commands, as a field lead for hunting or simply to give your dog as much freedom as possible. Webbing with neoprene padded wrist loop with eyelet, e.g. for attaching a dog tag or flasher non-slip and easy to grip Available in different lengths 3 m/17 mm - with wrist loop 5 m/17 mm - without wrist loop 10 m/17 mm - without wrist loop 15 m/17 mm - without hand loop Colours: Graphite / Papaya or Graphite / Ocean

CHF 14.90

Fusion Adjustable Leash
Fusion Adjustable Leash in two colors This rubberised extension leash is 3-way adjustable and is extremely comfortable to hold. It fits perfectly with the Fusion touring harnesses and is a practical everyday leash thanks to the hard-wearing material. rubberized webbing tape 3 stage adjustable variable use due to 2 fully adjustable rings, e.g. optional to attach around waist with loop e.g. for fastening dog tag or flasher non-slip with maximum grip Sizes available:Size: S-LDimensions: 2.00 m/17 mmLength: 2.00 mSize: L-XLMeasurements: 2,00 m/25 mmLength: 2,00 m

CHF 19.90

Suggested products

Action Lead ErgoMove Pro Black
Hunter ErgoMove Pro Action Lead, BlackThe Hunter ErgoMove Pro Action Lead in black is infinitely adjustable up to 230 cm and features a shock absorber, a padded short-lead handle, a neoprene wrist strap and reflective elements.The Hunter ErgoMove Pro Action Lead in black is a high-quality dog lead for everyday use, training and active walks. It combines well-thought-out functionality with excellent comfort and creates a reliable bond between owner and dog. The lead is infinitely adjustable up to a maximum of 230 cm, making it highly versatile – it can be kept short in busy situations or extended for relaxed walks with greater freedom of movement. A particularly practical feature is the option to wear the lead comfortably around your torso, leaving your hands free whilst out and about. The extra-light aluminium safety carabiner with quick-release fastening ensures simple and reliable handling. The integrated shock absorber gently absorbs sudden tugs. The soft neoprene padding on the wrist strap feels comfortable in the hand, while an additional padded handle makes it easier to keep your dog on a short lead safely in busy situations. Reflective elements improve visibility in low-light conditions.Your benefits at a glanceHigh-quality action lead for dogsColour: BlackInfinitely adjustable up to a maximum of 230 cmVersatile use for everyday life, training and walksCan be worn around the torsoExtra-light aluminium safety carabiner with quick-release fasteningIntegrated shock absorberComfortable neoprene padding in the hand strap areaAdditional padded handle for keeping the dog closeAdditional ring loop made from UHMWPEReflective elements for improved visibilityWashable at 30 °CAvailable sizesLength 230 cm, width 1.5 cmLength 230 cm, width 2 cmInstructions for useAdjust the lead to the desired length before going for a walk. It can be worn longer for greater freedom of movement; in busy situations, use the additional padded handle to keep the dog close. Check the carabiner, seams and adjustment points regularly for wear and tear. If the lead becomes dirty, it can be washed at 30 °C in accordance with the manufacturer’s instructions.Zoo Roco TipThe ErgoMove Pro action lead is the perfect match for the ErgoMove Pro harness of the same name. Together, the harness and lead form a comfortable combination for active dogs, training sessions and walks where safety, control and freedom of movement are important.

From CHF 39.90

Action Lead ErgoMove Pro Berry
Hunter ErgoMove Pro Action Lead – BerryThe Hunter ErgoMove Pro Action Lead in Berry is infinitely adjustable up to 230 cm and features a shock absorber, a padded short-lead handle, a neoprene wrist strap and reflective elements.The Hunter ErgoMove Pro Action Lead in Berry is a high-quality dog lead for everyday use, training and active walks. It combines well-thought-out functionality with excellent comfort, creating a safe, harmonious bond between owner and dog. The lead is infinitely adjustable up to a maximum of 230 cm, making it versatile in use – kept short in busy situations or extended for greater freedom of movement. A particularly practical feature is the option to wear the lead comfortably around your torso, leaving your hands free whilst out and about. The extra-light aluminium safety carabiner with quick-release fastening ensures simple and reliable handling. An integrated shock absorber gently absorbs sudden pulls. The comfortable neoprene padding on the wrist strap feels pleasant in the hand, while an additional padded handle makes it easier to keep your dog close at a safe distance. Reflective elements improve visibility in low-light conditions.Your benefits at a glanceHigh-quality action lead for dogsColour: BerryInfinitely adjustable up to a maximum of 230 cmVersatile use for everyday life, training and walksCan be worn around the torsoExtra-light aluminium safety carabiner with quick-release fasteningIntegrated shock absorberComfortable neoprene padding in the hand strap areaAdditional padded handle for keeping the dog closeAdditional ring loop made from UHMWPEReflective elements for improved visibilityWashable at 30 °CAvailable sizesLength 230 cm, width 1.5 cmLength 230 cm, width 2 cmInstructions for useAdjust the lead to the desired length before going for a walk. It can be worn longer for greater freedom of movement; in busy situations, use the additional padded handle to keep your dog close. Check the carabiner, seams and adjustment points regularly for signs of wear. If the lead gets dirty, it can be washed at 30 °C.Zoo Roco TipThe ErgoMove Pro action lead is the perfect match for the ErgoMove Pro harness of the same name. Together, the harness and lead form a comfortable combination for active dogs, training sessions and walks where safety, control and freedom of movement are important.

From CHF 39.90

Leash Action ErgoMove Pro – Brown
Hunter ErgoMove Pro Action Lead, BrownThe Hunter ErgoMove Pro Action Lead in brown is infinitely adjustable up to 230 cm and features a shock absorber, a padded short-lead handle, a neoprene wrist strap and reflective elements.The Hunter ErgoMove Pro Action Lead in brown is a high-quality dog lead for everyday use, training and active walks. It combines well-thought-out functionality with excellent comfort and creates a reliable connection between owner and dog. The lead is infinitely adjustable up to a maximum of 230 cm, making it highly versatile – it can be kept short in busy situations or extended for greater freedom of movement. A particularly practical feature is the option to wear the lead comfortably around your torso, leaving your hands free whilst out and about. The extra-light aluminium safety carabiner with quick-release fastener ensures simple and reliable handling. An integrated shock absorber gently absorbs sudden pulls. The comfortable neoprene padding around the wrist straps feels pleasant in the hand, whilst an additional padded handle makes it easier to keep your dog on a short lead safely. Reflective elements improve visibility in low-light conditions.Your benefits at a glanceHigh-quality action lead for dogsColour: BrownInfinitely adjustable up to a maximum of 230 cmVersatile use for everyday life, training and walksCan be worn around the torsoExtra-light aluminium safety carabiner with quick-release fastenerIntegrated shock absorberComfortable neoprene padding in the hand strap areaAdditional padded handle for keeping the dog on a short leadAdditional ring loop made from UHMWPEWashable at 30 °CReflective elements for improved visibilityAvailable sizesLength 230 cm, width 1.5 cmLength 230 cm, width 2 cmInstructions for useAdjust the lead to the desired length before going for a walk. It can be worn longer for greater freedom of movement; in busy situations, use the additional padded handle to keep your dog close. Check the carabiner, seams and adjustment points regularly for wear and tear. If the lead becomes dirty, it can be washed at 30 °C in accordance with the manufacturer’s instructions.Zoo Roco TipThe ErgoMove Pro action lead is the perfect match for the ErgoMove Pro harness of the same name. Together, the harness and lead form a comfortable combination for active dogs, training sessions and walks where safety, control and freedom of movement are important.

From CHF 39.90

Action ErgoMove Pro Lead, grey-green
Hunter ErgoMove Pro Action Lead, grey-greenThe Hunter ErgoMove Pro Action Lead in grey-green is infinitely adjustable up to 230 cm and features a shock absorber, a padded short-lead handle, a neoprene wrist strap and reflective elements.The Hunter ErgoMove Pro Action Lead in grey-green is a high-quality dog lead for everyday use, training and active walks. It combines well-thought-out functionality with comfortable handling and ensures a comfortable connection between owner and dog. The lead is infinitely adjustable up to a maximum of 230 cm, making it highly versatile – it can be kept short in busy situations or extended for greater freedom of movement. A particularly practical feature is the option to wear the lead around your upper body, leaving your hands free. The extra-light aluminium safety carabiner with quick-release fastening ensures simple and reliable handling. An integrated shock absorber gently absorbs sudden pulls. The comfortable neoprene padding in the hand strap area feels pleasant in the hand, whilst an additional padded handle makes it easier to keep the dog securely on a short lead. Reflective elements improve visibility in low-light conditions.Your benefits at a glanceHigh-quality action lead for dogsColour: Grey-green / grey-greenInfinitely adjustable up to a maximum of 230 cmVersatile use for everyday life, training and walksCan be worn around the torsoExtra-light aluminium safety carabiner with quick-release fastenerIntegrated shock absorberComfortable neoprene padding in the hand strap areaAdditional padded handle for keeping the dog on a short leadAdditional ring loop made from UHMWPEReflective elements for improved visibilityWashable at 30 °CAvailable sizesLength 230 cm, width 1.5 cmLength 230 cm, width 2 cmInstructions for useAdjust the lead to the desired length before going for a walk. It can be worn longer for greater freedom of movement; in busy situations, use the additional padded handle to keep your dog close. Check the carabiners, seams and adjustment points regularly for wear and tear. If the lead becomes dirty, it can be washed at 30 °C in accordance with the manufacturer’s instructions.Zoo Roco TipThe ErgoMove Pro action lead is the perfect match for the ErgoMove Pro harness of the same name. Together, the harness and lead form a comfortable combination for active dogs, training sessions and walks where safety, control and freedom of movement are important.

From CHF 39.90

Pure V-leash sage
Pure V-leash sageThe Pure V-leash round stitched in leather combines elegant design with high functionality and is the ideal choice for style-conscious dog owners. Made from high-quality nubuck leather and with a round stitched finish, the lead is particularly comfortable to hold and also offers a high level of stability. Thanks to the 3-way adjustability, the lead can be flexibly adapted to different everyday situations - whether on a relaxed walk, during training or in the city. The robust trigger snap hook ensures secure and quick attachment to the collar or harness. The simple look in the color sage underlines the timeless look and matches every coat color and style. Product details: Material: high-quality nubuck leather Workmanship: round-stitched for high wearing comfort Color: sage3-way adjustable for maximum flexibilitySturdy trigger snap hook for secure leashingZoo Roco tip: Nubuck leather is a natural material and is not waterproof. To maintain the suppleness and appearance of the lead, we recommend regular waterproofing. When wet, allow the leash to air dry slowly. Avoid direct heat and aggressive cleaning agents.

From CHF 55.90

Pure V-leash S
Pure V-leash SThe Pure V-leash round sewn from leather combines elegant design with high functionality and is the ideal choice for style-conscious dog owners. Made from high-quality nubuck leather and round stitched, the lead is particularly pleasant in the hand and also offers a high level of stability. Thanks to the 3-way adjustability the lead can be flexibly adapted to different everyday situations – whether on a relaxed walk, during training or in the city. The robust trigger snap hook ensures secure and quick fastening to the collar or harness. The simple appearance underlines the timeless look and suits every coat colour and style. Product details: Material: high-quality nubuck leather Finish: Round stitched3-way adjustable for maximum flexibilitySturdy trigger snap hook for secure leashingZoo Roco Tip: Nubuck leather is a natural material and not waterproof. To maintain the suppleness and appearance of the lead, we recommend regular impregnation. If wet, allow the lead to air dry slowly. Avoid direct heat and aggressive cleaning agents.

CHF 49.90

Pure V-leash sage
Pure V-leash SageThe Pure V-leash in leather combines elegant design with high functionality and is the ideal choice for style-conscious dog owners. Crafted from high-quality nubuck leather, the leash feels particularly comfortable in the hand whilst offering excellent durability. Thanks to the 3-way adjustability, the lead can be flexibly adapted to different everyday situations – whether on a relaxed walk, during training or in town. The robust trigger snap hook ensures a secure and quick attachment to the collar or harness. The simple look in the colour Sage underlines the timeless look and suits every coat colour and style. Product details: Material: high-quality nubuck leather Colour: Sage3-way adjustable for maximum flexibilitySturdy trigger snap hook for secure leashingZoo Roco Tip: Nubuck leather is a natural material and is not waterproof. To maintain the suppleness and appearance of the lead, we recommend regular waterproofing. When wet, allow the lead to air dry slowly. Avoid direct heat and aggressive cleaning agents.

From CHF 55.90

Pure V-leash brown
Pure V-Leash BrownThe Pure V-leash, round-stitched from leather combines elegant design with high functionality and is the ideal choice for style-conscious dog owners. Crafted from high-quality nubuck leather, the leash feels particularly comfortable in the hand whilst offering high durability. Thanks to the 3-way adjustability, the leash can be flexibly adapted to different everyday situations – whether on a relaxed walk, during training or in town. The robust Trigger Snap Hook ensures a secure and quick attachment to the collar or harness. The simple brown appearance underlines the timeless look and suits every coat colour and style. Product details: Material: high-quality nubuck leather Construction: round-stitched for high wearing comfort Colour: Brown3-way adjustable for maximum flexibilitySturdy Trigger Snap Hook for secure attachmentZoo Roco Tip: Nubuck leather is a natural material and not waterproof. To maintain the suppleness and appearance of the leash, we recommend regular waterproofing. When wet, allow the leash to air dry slowly. Avoid direct heat and aggressive cleaning agents.

From CHF 55.90

Pure V-leash light grey
Pure V-leash light greyThe Pure V-leash in leather combines elegant design with high functionality and is the ideal choice for style-conscious dog owners. Crafted from high-quality nubuck leather, the leash feels particularly comfortable in the hand whilst offering excellent durability. Thanks to the 3-way adjustability, the leash can be flexibly adapted to different everyday situations – whether on a relaxed walk, during training or in town. The robust trigger snap hook ensures a secure and quick attachment to the collar or harness. The simple light grey look underlines the timeless look and goes well with any coat colour and style. Product details: Material: high-quality nubuck leather Colour: light grey3-way adjustable for maximum flexibilitySturdy trigger snap hook for secure leashingZoo Roco Tip: Nubuck leather is a natural material and is not waterproof. To maintain the suppleness and appearance of the leash, we recommend regular waterproofing. When wet, allow the leash to air dry slowly. Avoid direct heat and aggressive cleaning agents.

From CHF 55.90

Pure V-leash black
Pure V-Leash BlackThe Pure V-Leash in leather combines elegant design with high functionality and is the ideal choice for style-conscious dog owners. Crafted from high-quality nubuck leather, the leash feels particularly comfortable in the hand whilst offering excellent durability. Thanks to the 3-way adjustability, the lead can be flexibly adapted to different everyday situations – whether on a relaxed walk, during training or in town. The robust trigger snap hook ensures a secure and quick attachment to the collar or harness. The simple black look underlines the timeless look and matches every coat colour and style. Product details: Material: high-quality nubuck leather Colour: Black3-way adjustable for maximum flexibilitySturdy trigger snap hook for secure leashingZoo Roco Tip: Nubuck leather is a natural material and is not waterproof. To maintain the suppleness and appearance of the lead, we recommend regular waterproofing. When wet, allow the lead to air dry slowly. Avoid direct heat and aggressive cleaning agents.

From CHF 55.90

Moxon leash - with reflective threads - blue
Moxon leash in rope design - blueThe Freezack Rope Moxon lead combines a modern rope design with reliable everyday practicality: robust, safe and flexible. As a moxon lead with an integrated collar, it is particularly practical when your dog needs to be kept short and under control - e.g. in the city, during training or when meeting dogs. Reflective threads are woven in for additional safety: this significantly increases visibility in the dark, rain, fog or at dusk.The lead is available in 8 mm and 12 mm thicknesses - whichever is more comfortable to hold.Product benefits at a glanceDurable & robust: hard-wearing nylon rope for everyday useReflective threads: better visibility & more safety in low light conditionsQuick on and off: Moxon system with integrated collar - ideal for on the goIndividually adjustable: adapts flexibly to the dog and situationSafe handling: for controlled walking on short distances and in confusing situationsZoo Roco tip: Especially in fall and winter: Use an additional LED clip light on the harness or coat - in combination with the reflective threads on the lead, you will be even more visible in traffic.

From CHF 16.90

Moxon leash - with reflective threads - black
Moxon leash in rope design blackThe Freezack Rope Moxon lead combines a modern rope design with reliable everyday practicality: robust, safe and flexible. As a moxon lead with integrated collar, it is particularly practical when your dog needs to be kept short and under control - e.g. in the city, during training or when meeting dogs.Reflective threads are woven in for additional safety: this significantly increases visibility in the dark, rain, fog or at dusk.This lead is available in two thicknesses 8mm and 12mm - whichever suits you better.Product advantages at a glanceDurable & robust: hard-wearing nylon rope for everyday useReflective threads: better visibility & more safety in low light conditionsQuick on and off: Moxon system with integrated collar - ideal for on the goIndividually adjustable: adapts flexibly to the dog and situationSafe handling: for controlled walking on short distances and in confusing situationsZoo Roco tip: Especially in fall and winter: Use an additional LED clip light on the harness or coat - in combination with the reflective threads on the lead, you will be even more visible in traffic.

From CHF 16.90

Customers also saw

Fusion extra long lead
Colors (2): graphite/papaya | Sizes (9): 1.80m / 17mm
Fusion extra long lead rubberised The Fusion extra long lead has a rubberised webbing which makes the lead extremely non-slip. The lead has a hand loop and is available in two strengths/widths. Rubberised webbing with neoprene-padded hand loop with eyelet, e.g. for attaching the dog tag or a flasher non-slip and grippy Available in two widths: 1.80 m / 17 mm 1.80 m / 25 mm Colours: Graphite / Papaya or Graphite / Ocean

CHF 15.90

Search line / towline 15 meters neon green
Search line / drag line 15 metres neon green Made from high-quality, soft PVC with snap hook water-resistant, high tensile strength, easy to clean the perfect search line for any weather and any surface Colour: neon green

CHF 26.90